Admin Request for Inspection REA Solar Mini Grid
Application for | REA Solar Mini-Grid Project |
---|---|
REA Code | REA-REF-MG |
REA LOT Number | NESP/IMAS |
Register as | Corporate |
NEMSA Certificate Number | CC/CEIF/PR/04720 |
First Name | Chris |
Last Name | Nwachukwu |
Position | Head Field Operations |
Phone | 08063984148 |
cnwachukwu@gve-group.com | |
Address |
No. 22A Suez Crescent, |
State | Federal Capital Territory |
Company Name | GVE Projects Ltd. |
Company Email | info@gve-group.com |
Company Phone | 08064075280 |
Tax Registration Number | 15753761-0001 |
Address |
No. 22A Suez Crescent |
State | Federal Capital Territory |
Name of the Village/Community | Bakin-Ciyawa |
State | Plateau |
Local Government Area | Qua’an Pan |
Number of Inhabitants | 12968 |
GPS Coordinates | N8.61308, E9.29238 |
Site Address/Detail Description |
395kWp isolated Mini-grid in Bakin-Ciyawa community, Qua’an Pan LGA of Plateau State with a 18.6km of low voltage distribution network. |
Activities | Business Activity, Administrative Facility, Educational Facility, Health Care Facility, Residential |
Total Solar PV Installed (kWp) | 395 |
Total Solar PV Energy Produce Per Day (kwh) | 2172.94 |
Total Storage Capacity (kwh) | 256 |
Total Load/Energy Requirement (kWh) | 1790 |
Storage Technology/Manufacturer | Ningbo Deye ESS International Trade Co., Ltd |
Type of Coupling (AC/DC) | DC |
Generator Rated Power (kVA) | 200 |
Year of Construction | 2024 |
Fuel Type | Diesel |
Generator Model/Manufacturer | MP200 Marapco Jubaili Bros |
Operation | Automatic |
Other Generation Technology | N/A |
Other Rated Power (kVA) | N/A |
Other Model/Manufacturer | N/A |
Date of Installation of Mini-Grid | August 9, 2024 |
Date of Application | November 19, 2024 |
Mini-Grid Owner (Full Name) | GVE Projects Ltd. |
Phone | 08064075280 |
iorajaka@gve-group.com | |
Manufacturer | JA Solar |
Model | JAM72S10-415/MR |
Technology | Mono-Crystalline |
STC power (Wp) | 415 |
Number of Cells | 144 |
MPPT Current | 10.51 |
MPPT Voltage | 1000V |
Module catalogue # | FUCB-MD16 |
Number Series | Parallel | 17s | 56p |
Total Power (Wp) | 395080 |
Fuse (A) | 15 |
Surge Protection Device | Type II In=20KA, Imax=40KA, Ucpv=1000V DC |
Converter Catalogue | https://drive.google.com/file/d/113TmtZlFDNi2eCkLnYI7idoyFAxcx0zg/view?usp=drive_link |
Cable cross-section | 10mmsq |
Manufacturer | Ningbo Deye Inverter Co., Ltd |
Model | SUN-50K-SG01HP3 – EU |
Technology | Hybrid Inverter |
Rated Power | 200kW (4 units of 50kW each) |
Rated Voltage | 1000VDC | 400VAC |
Rated Current | 83 |
Manufacturer | Ningbo Deye ESS International Trade Co., Ltd |
Model | BOS-GM5.1 |
Technology | LFP |
Cell Voltage (V) | 3.2 |
Battery Voltage | 51.2 |
C10 Capacity | 5.12kWh |
Charge Voltage | 600 |
Module Catalogue # | https://drive.google.com/file/d/1bre3eXJR0X1hrpYuenlrMGc_HsNyPplL/view?usp=drive_link |
Number Series | Parallel | 10s | 5p |
Total C10 capacity [kWh] | 256 |
Fuse rating [A] | 600 |
Date of cell production | October 17, 2023 |
Date of installation | May 8, 2024 |
Cable cross-section [mm²] | 35 |
PV Generator | Expected open circuit voltage [V] |
String Number | 1 |
Value | 50.41 |
Inverter/Charge Controller | General visual inspection observations |
String Number | 1 |
Reference | Okay |
Battery Storage | General visual inspection observations |
String Number | 1 |
Reference | Okay |
General Safety/Security | General visual inspection observations |
String Number | 1 |
Reference | Okay |
Official Letter of Request | https://nemsa.gov.ng/wp-content/uploads/formidable/67/GVE-Bakin-Ciyawa-PV-Solar-Hybrid-SLD.pdf |
PV System | https://nemsa.gov.ng/wp-content/uploads/formidable/67/JAM72S10-400-420-MR-Global_EN_20200729A-1.pdf |
Charge Controller or Grid-tie Inverter | https://nemsa.gov.ng/wp-content/uploads/formidable/67/Deye-SUN-50K-SG01HP3-EU-BM4-3Phase-Inverter-6.pdf |
Combiner Boxes | https://nemsa.gov.ng/wp-content/uploads/formidable/67/Chint-1500V-PV-Combiner-Box-4.pdf |
Battery System | https://nemsa.gov.ng/wp-content/uploads/formidable/67/Deye-BOS-G-HV-Battery-Datasheet-5.pdf |
Earthing & Surge Protection System | https://nemsa.gov.ng/wp-content/uploads/formidable/67/EARTHING-DESIGN-FOR-BAKIN-CHIYAWA-MINIGRID-SITES-Model.pdf |
User ID | Ifeanyi Orajaka |