Admin Request for Inspection REA Solar Mini Grid
Application for | REA Solar Mini-Grid Project |
---|---|
REA Code | REA-NEP-MG |
REA LOT Number | 0236 |
REA-NEP-MG | PBG |
Blank | Benin |
Register as | Corporate |
NEMSA Certificate Number | CC/EIF/PR/01447 |
First Name | CHIJIOKE |
Last Name | OBIZUE |
Other Name | EMMANUEL |
Position | PROJECT ENGINEER |
Phone | 08034843035 |
emmanuel.obizue@everlinktelesat.com | |
Address |
106 old airport road warri, Delta State |
State | Delta |
Company Name | EVERLINK TELESAT NETWORK LIMITED |
Company Email | bogbalor@everlinktelesat.com |
Company Phone | 08036681396 |
Tax Registration Number | 02491158-0001 |
Address |
106 old airport road warri, Delta State |
State | Delta |
Name of the Village/Community | AKUGBENE |
State | Delta |
Local Government Area | Bomadi |
Number of Inhabitants | 3000 |
GPS Coordinates | 5°15’23.77″N 5°50’37.30″E |
Site Address/Detail Description |
Akugbene is a rural community situated in Bomadi of Delta State, South-South region, Nigeria. The community stretches to about 2.5km with clustered households in the community. The population of the community is approximately 2500 permanent and 500 transient residents, including the children. |
Activities | Business Activity, Administrative Facility, Educational Facility, Health Care Facility, Residential |
Total Solar PV Installed (kWp) | 550 |
Total Solar PV Energy Produce Per Day (kwh) | 4400 |
Total Storage Capacity (kwh) | 360 |
Total Load/Energy Requirement (kWh) | 3575 |
Storage Technology/Manufacturer | SOLAR GAP TECHNOLOGY |
Type of Coupling (AC/DC) | DC |
Generator Rated Power (kVA) | 200*3 |
Year of Construction | 2022 |
Fuel Type | Diesel |
Generator Model/Manufacturer | PERKINS |
Operation | AUTOMATIC |
Date of Installation of Mini-Grid | November 20, 2023 |
Date of Application | March 7, 2024 |
Mini-Grid Owner (Full Name) | EVERLINK TELESAT NETWORK LIMITED |
Phone | 08036681396 |
bogbalor@verlinktelesat.com | |
Applicant | Chijioke Emmanuel Obizue |
Phone | 08079616963 |
emmanuel.obizue@everlinktelesat.com | |
Manufacturer | JA SOLAR/TPC ENERJI |
Model | JAM72S20-455/MR and TPC675-108PM12 |
Technology | PERC MONOCRYSTALLINE SOLAR MODULE |
STC power (Wp) | 455675 |
Number of Cells | 144 |
MPPT Current | 100A |
MPPT Voltage | 360V |
Module catalogue # | 83 |
Number Series | Parallel | 13|3 |
Total Power (Wp) | 8775 |
Fuse (A) | 20 |
Surge Protection Device | tpc enerji surge protection device |
Converter Catalogue | N/A |
Cable cross-section | 10mmsq |
Manufacturer | TPC ENERJI |
Model | 96,152(360)100A |
Technology | TPC ENERJI CP WALL-MOUNTED SOLAR CONTROLLER |
Rated Power | 24KWP |
Rated Voltage | 360V |
Rated Current | 100A |
Manufacturer | SOLAR GAP |
Model | SGB1000 2V100AH |
Technology | DEEP CIRLCE |
Cell Voltage (V) | 1.80V/CELL |
Battery Voltage | 2V |
C10 Capacity | 2V1000AH |
Charge Voltage | 8V |
Module Catalogue # | 180 |
Number Series | Parallel | 1|1 |
Total C10 capacity [kWh] | 4000 |
Fuse rating [A] | 20 |
Date of cell production | June 5, 2023 |
Date of installation | December 11, 2023 |
Cable cross-section [mm²] | 120 |
PV Generator | Result of verification of measured values (OK, low, …) |
String Number | 1 |
Value | okay |
Inverter/Charge Controller | General visual inspection observations |
String Number | 1 |
Reference | okay |
Battery Storage | General visual inspection observations |
String Number | 1 |
Reference | okay |
General Safety/Security | General visual inspection observations |
String Number | 1 |
Reference | okay |
Official Letter of Request | https://nemsa.gov.ng/wp-content/uploads/formidable/67/AKUGBENE_MINIGRID_NEMSA_INSPECTION_REQUEST_BY_EVERLINK1.pdf |
PV System | https://nemsa.gov.ng/wp-content/uploads/formidable/67/Akugbene-550KWp-SLD.pdf |
Charge Controller or Grid-tie Inverter | https://nemsa.gov.ng/wp-content/uploads/formidable/67/TPC-T300-SERIES-20-400kVA.pdf |
Combiner Boxes | https://nemsa.gov.ng/wp-content/uploads/formidable/67/Akugbene-550KWp-SLD-1.pdf |
Battery System | https://nemsa.gov.ng/wp-content/uploads/formidable/67/BATTERIES-DATA-SHEET-SOLARGAP-SUPPLIED-1.pdf |
Earthing & Surge Protection System | https://nemsa.gov.ng/wp-content/uploads/formidable/67/Akugbene-550KWp-SLD-2.pdf |
User ID | Chijioke Obizue |