Admin Request for Inspection REA Solar Mini Grid
Application for | REA Solar Mini-Grid Project |
---|---|
REA Code | REA-NEP-MG |
REA LOT Number | 253 |
REA-NEP-MG | PBG |
Blank | Abuja |
Register as | Corporate |
NEMSA Certificate Number | CC/CEIF/PR/03425 |
First Name | Anthony |
Last Name | Uchechukwu |
Other Name | Luca |
Position | Operations Officer |
Phone | 09062798374 |
lucatony73@gmail.com | |
Address |
66 Younde Street, |
State | Federal Capital Territory |
Company Name | NEBULAR ENGINEERING SOLUTIONS LTD. |
Company Email | nebular.engr@gmail.com |
Company Phone | 08104830579 |
Tax Registration Number | 21120361-0001 |
Address |
Plot 414 A Close, Gwarinpa Estate, Abuja. |
State | Federal Capital Territory |
Name of the Village/Community | Jijipe |
State | Nasarawa |
Local Government Area | Karu |
Number of Inhabitants | 3789 |
GPS Coordinates | 8.76713, 7.585397 |
Site Address/Detail Description |
The site is located in this coordinate 8.76713, 7.585397, in Jijipe community, Karu LGA of Nasarawa State under the REA NEP Performance Based Grant. The project is aimed at providing reliable electricity to 350 Households, 10 Commercial Users, 5 special centres, including Health Centre and 3 industrial. |
Activities | Business Activity, Administrative Facility, Educational Facility, Health Care Facility, Residential, Religious |
Total Solar PV Installed (kWp) | 44.55 |
Total Solar PV Energy Produce Per Day (kwh) | 653 |
Total Storage Capacity (kwh) | 105 |
Total Load/Energy Requirement (kWh) | 10 |
Storage Technology/Manufacturer | Li-on/Life PO4 |
Type of Coupling (AC/DC) | DC Coupled |
Generator Rated Power (kVA) | 200 |
Year of Construction | 2022 |
Fuel Type | Diesel |
Generator Model/Manufacturer | FG WILSON |
Operation | Auto/Backup |
Date of Installation of Mini-Grid | December 1, 2023 |
Date of Application | January 31, 2024 |
Mini-Grid Owner (Full Name) | NEBULAR ENGINEERING SOLUTIONS LTD. |
Phone | 08104830579 |
nebular.engr@gmail.com | |
Manufacturer | Sora |
Model | 550M |
Technology | Monocrystralline |
STC power (Wp) | 550 |
Number of Cells | 144 |
MPPT Current | 13.01A |
MPPT Voltage | 42.31 |
Module catalogue # | 81 |
Number Series | Parallel | 12| 7 |
Total Power (Wp) | 44.55kWp |
Fuse (A) | 32 |
Surge Protection Device | SPD 1000Vdc |
Converter Catalogue | Galaxy Solar |
Cable cross-section | 4mmsqr |
Manufacturer | Galaxy Solar |
Model | MGSP5K |
Technology | Hybrid Inverter |
Rated Power | 5kW |
Rated Voltage | 110V |
Rated Current | 110V |
Manufacturer | LiFePO4 |
Model | VG48300 |
Technology | Li-on |
Cell Voltage (V) | 51.2V |
Battery Voltage | 51.2V |
C10 Capacity | 5kWh |
Charge Voltage | 57.6V |
Module Catalogue # | 7 |
Number Series | Parallel | 7 Parallel |
Total C10 capacity [kWh] | 105kWh |
Fuse rating [A] | 200 |
Date of cell production | July 7, 2023 |
Date of installation | December 15, 2023 |
Cable cross-section [mm²] | 35mmsqr |
PV Generator | General visual inspection observations |
String Number | 1 |
Value | ok |
PV Generator | Surge Protective Devices functional (indicator at device)? |
String Number | 1 |
Value | ok |
PV Generator | Overcurrent protection operational (correct fuse rating)? |
String Number | 1 |
Value | ok |
PV Generator | Alternatively, estimated insulation (cloudy, sunny, mist, …) |
String Number | 1 |
Value | ok |
Inverter/Charge Controller | General visual inspection observations |
String Number | 2 |
Reference | ok |
Inverter/Charge Controller | Inverter protection settings programmed to local requirements? |
String Number | 2 |
Reference | yes |
Inverter/Charge Controller | Inverter/charge controller protection settings and installer details displayed on site? |
String Number | 2 |
Reference | ok |
Inverter/Charge Controller | Isolating and switching devices been connected such that PC installation is wired to the “load” side and the public supply to the “source” side? |
String Number | 2 |
Reference | ok |
Battery Storage | General visual inspection observations |
String Number | 1 |
Reference | ok |
Battery Storage | Safety measures for the respective types of batteries applied |
String Number | 1 |
Reference | Yes |
General Safety/Security | General visual inspection observations |
String Number | 1 |
Reference | ok |
General Safety/Security | Inverter protection settings programmed to local requirements? |
String Number | 1 |
Reference | yes |
General Safety/Security | All Inverters/Charge controller operating correctly? |
String Number | 1 |
Reference | 80 |
Official Letter of Request | https://nemsa.gov.ng/wp-content/uploads/formidable/67/Nebluar-Mini-Grid-_-Request-for-Inspection-and-Certification-of-Barkin-Ayini-Iwa-sabo-Jijipe-and-4.pdf |
PV System | https://nemsa.gov.ng/wp-content/uploads/formidable/67/Jijipe-PV-System-2.pdf |
Charge Controller or Grid-tie Inverter | https://nemsa.gov.ng/wp-content/uploads/formidable/67/SLD-for-Charge-controller-4-150×150.png |
Combiner Boxes | https://nemsa.gov.ng/wp-content/uploads/formidable/67/Combiner-Boxes-4.pdf |
Battery System | https://nemsa.gov.ng/wp-content/uploads/formidable/67/JIJIPE-Battery-System-2.pdf |
Earthing & Surge Protection System | https://nemsa.gov.ng/wp-content/uploads/formidable/67/Earthing-and-Surge-protection-system-3.pdf |
User ID | Luca Tony |