Admin Request for Inspection REA Solar Mini Grid
Application for | REA Solar Mini-Grid Project |
---|---|
REA Code | REA-NEP-MG |
REA LOT Number | 4 |
REA-NEP-MG | PBG |
Blank | Akure |
Register as | Corporate |
NEMSA Certificate Number | CC/CIEF/PR/00058 |
First Name | Francis |
Last Name | Muoneke |
Position | Project Engineer |
Phone | 08039488315 |
fmuoneke@cesel.com.ng | |
Address |
52A Campbell Street (4th floor), Lagos. |
State | Lagos |
Company Name | COMMUNITY ENERGY SOCIAL ENTERPRISE LIMITED |
Company Email | ptolani@cesel.com.ng |
Company Phone | +2348100000127 |
Tax Registration Number | 18411141 |
Address |
52A Campbell Street (4th floor), Lagos. |
State | Lagos |
Name of the Village/Community | Alutierin |
State | Osun |
Local Government Area | Ife South |
Number of Inhabitants | 1400 |
GPS Coordinates | N 07.21309° E004.52580° |
Site Address/Detail Description |
Alutierin is a rural community situated in Ife South of Osun State, off Ife-Ondo road, South-Western region, Nigeria. The population is 1400 permanent and 300 transient residents including the children. It stretches at about 1.2km |
Activities | Business Activity, Educational Facility, Residential |
Total Solar PV Installed (kWp) | 29 |
Total Solar PV Energy Produce Per Day (kwh) | 162 |
Total Storage Capacity (kwh) | 65 |
Total Load/Energy Requirement (kWh) | 146 |
Storage Technology/Manufacturer | Lithium Ion Storage/ Alpha ESS |
Type of Coupling (AC/DC) | DC |
Generator Rated Power (kVA) | 20 |
Year of Construction | 2022 |
Fuel Type | Diesel |
Generator Model/Manufacturer | 4D24G4/A / Mikano |
Operation | Automatic |
Date of Installation of Mini-Grid | September 22, 2023 |
Date of Application | September 17, 2023 |
Mini-Grid Owner (Full Name) | CESEL-CONCERTO JV |
Phone | +2348100000127 |
ptolani@cesel.com.ng | |
Manufacturer | JA SOLAR |
Model | JAM72S30-545/MR |
Technology | 11BB PERC CELLS |
STC power (Wp) | 545 |
Number of Cells | 144 |
MPPT Current | 13.04 |
MPPT Voltage | 41.80 |
Module catalogue # | 54 |
Number Series | Parallel | 3|3 |
Total Power (Wp) | 29 |
Fuse (A) | 375 |
Surge Protection Device | Schneider DC SPD |
Converter Catalogue | 6 |
Cable cross-section | 6sqm |
Manufacturer | Voltronic Power |
Model | Axpert King 5K |
Technology | Off-Grid Inverter |
Rated Power | 5kVA |
Rated Voltage | 220V |
Rated Current | 22.7A |
Manufacturer | Alpha ESS |
Model | M48112-P |
Technology | Lithium Ion |
Cell Voltage (V) | 3.2 |
Battery Voltage | 48 |
C10 Capacity | 4.9kWh |
Charge Voltage | 54.5 |
Module Catalogue # | 12 |
Number Series | Parallel | |6 |
Total C10 capacity [kWh] | 58.8 |
Fuse rating [A] | 125A |
Date of cell production | December 13, 2022 |
Date of installation | August 21, 2023 |
Cable cross-section [mm²] | 35 |
General comments | 4 batteries are connected in parallel, and 1 BMU controls 2 strings of 4 batteries connected in parallel. There are 3 BMUs and 1 Master BMU that monitors the 3 BMU. |
PV Generator | Expected open circuit voltage [V] |
String Number | 3 |
Value | 139V |
PV Generator | Measured open circuit voltage [V] |
String Number | 3 |
Value | 138V |
PV Generator | Measured load circuit voltage [V] |
String Number | 3 |
Value | 136V |
PV Generator | Connectors properly connected under no mechanical strain |
String Number | 3 |
Value | Connectors were properly connected |
Inverter/Charge Controller | General visual inspection observations |
String Number | 6 |
Reference | There are 6 units of 5kVA inverters, connected in parallel giving a total of 30kVA |
Inverter/Charge Controller | Isolating and switching devices been connected such that PC installation is wired to the “load” side and the public supply to the “source” side? |
String Number | 6 |
Reference | Breakers and Changeover switch can isolate load from source. |
Inverter/Charge Controller | All Inverters/Charge controller operating correctly? |
String Number | 6 |
Reference | The inverters have inbuilt MPPT charge controller and they are all working properly |
Inverter/Charge Controller | Inverter/charge controller protection settings and installer details displayed on site? |
String Number | 6 |
Reference | The Inverter has a display screen, making it easy to configure the settings and troubleshoot |
Battery Storage | General visual inspection observations |
String Number | 2 |
Reference | 6 batteries are connected in parallel, and 1 BMU controls 2 strings of 6 batteries connected in parallel. |
Battery Storage | Wiring properly done without visual deficits |
String Number | 2 |
Reference | Wiring was properly done, and lugs firmly terminated. |
Battery Storage | State of charge (If applicable state of health) |
String Number | 2 |
Reference | Battery Monitoring Unit (BMU) shows the battery state of charge |
Battery Storage | Deep discharge protection, over-charge protection and temperature monitoring installed and functional |
String Number | 2 |
Reference | BMU and Inverter monitors the battery level and temperature, and prevents it from over-discharging. |
General Safety/Security | Inverter protection settings programmed to local requirements? |
String Number | 6 |
Reference | Inverter meets local requirement (220V, 50Hz) and can handle surge current twice its capacity |
General Safety/Security | Isolating and switching devices been connected such that PC installation is wired to the “load” side and the public supply to the “source” side? |
String Number | 6 |
Reference | Breakers and Changeover switch can isolate load from source. |
General Safety/Security | All Inverters/Charge controller operating correctly? |
String Number | 6 |
Reference | The inverters have inbuilt MPPT charge controller and they are all working properly |
Official Letter of Request | https://nemsa.gov.ng/wp-content/uploads/formidable/67/NEMSA-Letter-of-Request-2.pdf |
PV System | https://nemsa.gov.ng/wp-content/uploads/formidable/67/540Wp-545Wp-JAM-Solar-Panels-2.pdf |
Charge Controller or Grid-tie Inverter | https://nemsa.gov.ng/wp-content/uploads/formidable/67/Inverter-2.pdf |
Combiner Boxes | https://nemsa.gov.ng/wp-content/uploads/formidable/67/30kVA-SLD.pdf |
Battery System | https://nemsa.gov.ng/wp-content/uploads/formidable/67/5.4kWh-Li-Fe-Battery-Data-Sheet-3.pdf |
Earthing & Surge Protection System | https://nemsa.gov.ng/wp-content/uploads/formidable/67/30kVA-SLD-1.pdf |
User ID | Francis Muoneke |