Admin Request for Inspection REA Solar Mini Grid

Application for REA Solar Mini-Grid Project
REA Code REA-NEP-MG
REA LOT Number 052
REA-NEP-MG PBG
Inspectorate Field Office closest to site location Akure
Register as Corporate
NEMSA Certificate Number CC/CEIF/PR/00609
First Name Joseph
Last Name Ojo
Position Chief Business Officer
Phone 07039476932
Email j.ojo@a4tintegrated.com
Address

No. 27b, Olumoroti Jaiyesimi Street, Gbagada Phase 2, Lagos.

State Lagos
Company Name A4&T Power Solutions
Company Email info@a4tintegrated.com
Company Phone 07039476932
Tax Registration Number 20022603-0001
Address

No. 27b, Olumoroti Jaiyesimi Street, Gbagada Phase 2, Lagos.

State Lagos
Name of the Village/Community Laoso
State Ondo
Local Government Area Ondo West
Number of Inhabitants 3600
GPS Coordinates Lat:6.964928, Long:4.645497
Site Address/Detail Description

Laoso is an Agro-based community in Ondo West Local Government of Ondo State. The community has majority of her residents economic activities in farming. The population is populated with over 600 households.

Activities Business Activity, Educational Facility, Health Care Facility, Residential
Total Solar PV Installed (kWp) 53
Total Solar PV Energy Produce Per Day (kwh) 137.4
Total Storage Capacity (kwh) 144kWh
Total Load/Energy Requirement (kWh) 248.52
Storage Technology/Manufacturer Lead Acid/Eternity
Type of Coupling (AC/DC) DC
Generator Rated Power (kVA) 60
Year of Construction 2021
Fuel Type Diesel
Generator Model/Manufacturer Perkins
Operation Automatic
Date of Installation of Mini-Grid November 17, 2021
Date of Application June 21, 2023

Manufacturer Jinko
Model JKM410M-72
Technology Monocrstalline
STC power (Wp) 400
Number of Cells 72
MPPT Current 80Amps
MPPT Voltage 150V

Module catalogue # JKM410M-72
Number Series | Parallel 18
Total Power (Wp) 32
Fuse (A) 250
Surge Protection Device 20KA/40KA
Converter Catalogue 0
Cable cross-section 10mm2

Manufacturer Schneider
Model CL36000
Technology MPPT
Rated Power 36000
Rated Voltage 1000
Rated Current 53.5A

Manufacturer Eternity
Model 1080AH
Technology Lead Acid
Cell Voltage (V) 2.3
Battery Voltage 2V
C10 Capacity 5.37
Charge Voltage 2.43

Module Catalogue # 2
Number Series | Parallel 3-2
Total C10 capacity [kWh] 1080
Fuse rating [A] 250
Date of cell production June 21, 2021
Date of installation November 15, 2021
Cable cross-section [mm²] 120

PV Generator Expected open circuit voltage [V]
String Number 1
Value 430.6
PV Generator Measured open circuit voltage [V]
String Number 1
Value 301.4
PV Generator Expected load circuit voltage [V]
String Number 1
Value 50.4
PV Generator Measured load circuit voltage [V]
String Number 1
Value 48.9
PV Generator General visual inspection observations
String Number 1
Value OK
PV Generator Expected short circuit current [A]
String Number 1
Value 10.60
PV Generator Measured short circuit current [A]
String Number 1
Value 8.26
PV Generator Measured ambient temperature [°C]
String Number 1
Value 25
PV Generator Measured module temperature [°C]
String Number 1
Value 24.8
PV Generator Alternatively, estimated insulation (cloudy, sunny, mist, …)
String Number 1
Value OK
PV Generator Expected power output [kW]
String Number 1
Value 410
PV Generator Measured power output [kW]
String Number 1
Value 409.9
PV Generator Surge Protective Devices functional (indicator at device)?
String Number 1
Value OK
PV Generator Overcurrent protection operational (correct fuse rating)?
String Number 1
Value OK
PV Generator Result of verification of measured values (OK, low, …)
String Number 1
Value OK
PV Generator String cables fixed and cables without damages
String Number 1
Value YES
PV Generator Connectors properly connected under no mechanical strain
String Number 1
Value OK

Inverter/Charge Controller General visual inspection observations
String Number 1
Reference Yes
Inverter/Charge Controller Inverter protection settings programmed to local requirements?
String Number 1
Reference Yes
Inverter/Charge Controller When an RCD is installed to the AC circuit feeding an inverter, the RCD type shall be verified to ensure it has been selected according to the requirements of IEC 60364
String Number 1
Reference Done
Inverter/Charge Controller Means of isolating the inverter been provided on the AC side?
String Number 1
Reference Yes
Inverter/Charge Controller Isolating and switching devices been connected such that PC installation is wired to the “load” side and the public supply to the “source” side?
String Number 1
Reference Yes
Inverter/Charge Controller All Inverters/Charge controller operating correctly?
String Number 1
Reference Yes
Inverter/Charge Controller Inverter/charge controller protection settings and installer details displayed on site?
String Number 1
Reference Yes

Battery Storage General visual inspection observations
String Number 1
Reference Done
Battery Storage Wiring properly done without visual deficits
String Number 1
Reference Yes
Battery Storage Cell temperature
String Number 1
Reference 25
Battery Storage Tightening torque of all screws to connectors to the batteries and in between the cells of the batteries is according to the equipment manufacturer’s recommendations
String Number 1
Reference Yes
Battery Storage Battery inverter or charge controller parameters are properly set (correct system configuration, date and time, control of the load shedding relays, reading of external temperature sensor verified, …)
String Number 1
Reference Yes
Battery Storage Safety measures for the respective types of batteries applied
String Number 1
Reference Yes

General Safety/Security General visual inspection observations
String Number 1
Reference Yes
General Safety/Security Inverter protection settings programmed to local requirements?
String Number 1
Reference Yes
General Safety/Security When an RCD is installed to the AC circuit feeding an inverter, the RCD type shall be verified to ensure it has been selected according to the requirements of IEC 60364
String Number 1
Reference Done
General Safety/Security Means of isolating the inverter been provided on the AC side?
String Number 1
Reference Yes
General Safety/Security Isolating and switching devices been connected such that PC installation is wired to the “load” side and the public supply to the “source” side?
String Number 1
Reference Yes
General Safety/Security All Inverters/Charge controller operating correctly?
String Number 1
Reference OK
General Safety/Security Inverter/charge controller protection settings and installer details displayed on site?
String Number 1
Reference OK
Official Letter of Request https://nemsa.gov.ng/wp-content/uploads/formidable/67/Letter-for-Inspection-Request.pdf
PV System https://nemsa.gov.ng/wp-content/uploads/formidable/67/PV_SYSTEM_LAOSO.pdf
Charge Controller or Grid-tie Inverter https://nemsa.gov.ng/wp-content/uploads/formidable/67/GRID-TIE-INVERTER-LAOSO.pdf
Combiner Boxes https://nemsa.gov.ng/wp-content/uploads/formidable/67/COMBINER-BOX-1-1.pdf
Battery System https://nemsa.gov.ng/wp-content/uploads/formidable/67/BATTERY-SYSTEM-LAOSO.pdf
Earthing & Surge Protection System https://nemsa.gov.ng/wp-content/uploads/formidable/67/Earthing-System-Surge-Protection.docx-2.pdf
User ID Joseph Ojo