Admin Request for Inspection REA Solar Mini Grid
Application for | REA Solar Mini-Grid Project |
---|---|
REA Code | REA-NEP-MG |
REA LOT Number | 054 |
REA-NEP-MG | PBG |
Blank | Akure |
Register as | Corporate |
NEMSA Certificate Number | CC/CEIF/PR00609 |
First Name | Joseph |
Last Name | Ojo |
Position | Chief Business Officer |
Phone | 07039476932 |
j.ojo@a4tintegrated.com | |
Address |
No 27B, Olumoroti Jayeisimi Street, Gbagada Phase 2, Lagos |
State | Lagos |
Company Name | A4&T Power Solutions |
Company Email | info@a4tintegrated.com |
Company Phone | 07039476932 |
Tax Registration Number | 20022603-0001 |
Address |
No 27B, Olumoroti Jayeisimi Street, Gbagada Phase 2, Lagos |
State | Lagos |
Name of the Village/Community | Ilugha |
State | Ondo |
Local Government Area | Ondo West |
Number of Inhabitants | 4000 |
GPS Coordinates | Lat: 6.91493, Long: 4.646107 |
Site Address/Detail Description |
Ilugha Community, Ondo West LGA, Ondo State. |
Activities | Business Activity, Health Care Facility, Residential, Public Institutions |
Total Solar PV Installed (kWp) | 52.8 |
Total Solar PV Energy Produce Per Day (kwh) | 154.44 |
Total Storage Capacity (kwh) | 90 |
Total Load/Energy Requirement (kWh) | 248.52 |
Storage Technology/Manufacturer | Lithium/Felicity |
Type of Coupling (AC/DC) | DC |
Generator Rated Power (kVA) | 60 |
Year of Construction | 2023 |
Fuel Type | Diesel |
Generator Model/Manufacturer | Perkins |
Operation | Automatic |
Date of Installation of Mini-Grid | April 10, 2023 |
Date of Application | June 5, 2023 |
Manufacturer | Jinko |
Model | JKM400M-6RL3-V |
Technology | Monocrstalline |
STC power (Wp) | 400 |
Number of Cells | 72 |
MPPT Current | 80Amps |
MPPT Voltage | 150V |
Module catalogue # | 10 |
Number Series | Parallel | 9-3 |
Total Power (Wp) | 32 |
Fuse (A) | 250 |
Surge Protection Device | 20KA/40KA |
Converter Catalogue | 0 |
Cable cross-section | 10mm2 |
Manufacturer | Just Stand Out |
Model | JSO12048165 |
Technology | MPPT |
Rated Power | 15600 |
Rated Voltage | 800 |
Rated Current | 80 |
Manufacturer | Felicity |
Model | LPBF Series 48300 |
Technology | Lithium |
Cell Voltage (V) | 48 |
Battery Voltage | 48V |
C10 Capacity | 0 |
Charge Voltage | 51.2 |
Module Catalogue # | LPBF Series 48300 |
Number Series | Parallel | 1-6 in parallel |
Total C10 capacity [kWh] | 90 |
Fuse rating [A] | 250 |
Date of cell production | January 15, 2022 |
Date of installation | May 15, 2023 |
Cable cross-section [mm²] | 120 |
PV Generator | Expected open circuit voltage [V] |
String Number | 1 |
Value | 448.2 |
PV Generator | Measured open circuit voltage [V] |
String Number | 1 |
Value | 291.33 |
PV Generator | Expected load circuit voltage [V] |
String Number | 1 |
Value | 375.3 |
PV Generator | Measured load circuit voltage [V] |
String Number | 1 |
Value | 243.95 |
PV Generator | Expected short circuit current [A] |
String Number | 1 |
Value | 10.36A |
PV Generator | Expected power output [kW] |
String Number | 1 |
Value | 3600W |
PV Generator | Measured power output [kW] |
String Number | 1 |
Value | 2340W |
PV Generator | Measured earth resistance of support structure [Ohm] |
String Number | 1 |
Value | 0.5 |
PV Generator | General visual inspection observations |
String Number | 1 |
Value | Ok |
PV Generator | Surge Protective Devices functional (indicator at device)? |
String Number | 1 |
Value | Available |
PV Generator | String cables fixed and cables without damages |
String Number | 1 |
Value | ok |
PV Generator | Overcurrent protection operational (correct fuse rating)? |
String Number | 1 |
Value | Available |
PV Generator | Connectors properly connected under no mechanical strain |
String Number | 1 |
Value | Ok |
Inverter/Charge Controller | General visual inspection observations |
String Number | 1 |
Reference | OK |
Inverter/Charge Controller | Inverter protection settings programmed to local requirements? |
String Number | 1 |
Reference | ok |
Inverter/Charge Controller | Isolating and switching devices been connected such that PC installation is wired to the “load” side and the public supply to the “source” side? |
String Number | 1 |
Reference | Available |
Inverter/Charge Controller | All Inverters/Charge controller operating correctly? |
String Number | 1 |
Reference | 0k |
Inverter/Charge Controller | Inverter/charge controller protection settings and installer details displayed on site? |
String Number | 1 |
Reference | Ok |
Inverter/Charge Controller | Means of isolating the inverter been provided on the AC side? |
String Number | 1 |
Reference | Available |
Battery Storage | General visual inspection observations |
String Number | 1 |
Reference | OK |
Battery Storage | Wiring properly done without visual deficits |
String Number | 1 |
Reference | Done |
Battery Storage | Tightening torque of all screws to connectors to the batteries and in between the cells of the batteries is according to the equipment manufacturer’s recommendations |
String Number | 1 |
Reference | Done |
Battery Storage | Battery inverter or charge controller parameters are properly set (correct system configuration, date and time, control of the load shedding relays, reading of external temperature sensor verified, …) |
String Number | 1 |
Reference | Done |
Battery Storage | Safety measures for the respective types of batteries applied |
String Number | 1 |
Reference | Done |
Battery Storage | Deep discharge protection, over-charge protection and temperature monitoring installed and functional |
String Number | 1 |
Reference | Available |
Battery Storage | Cell voltage |
String Number | 1 |
Reference | 48 |
Battery Storage | Cell temperature |
String Number | 1 |
Reference | 25 |
Battery Storage | Number of full cycles calculated by the monitoring system (if applicable) |
String Number | 1 |
Reference | 6000 |
General Safety/Security | General visual inspection observations |
String Number | 1 |
Reference | OK |
General Safety/Security | Inverter protection settings programmed to local requirements? |
String Number | 1 |
Reference | Done |
General Safety/Security | Means of isolating the inverter been provided on the AC side? |
String Number | 1 |
Reference | Available |
General Safety/Security | Isolating and switching devices been connected such that PC installation is wired to the “load” side and the public supply to the “source” side? |
String Number | 1 |
Reference | Available |
General Safety/Security | All Inverters/Charge controller operating correctly? |
String Number | 1 |
Reference | Ok |
General Safety/Security | Inverter/charge controller protection settings and installer details displayed on site? |
String Number | 1 |
Reference | Ok |
Official Letter of Request | https://nemsa.gov.ng/wp-content/uploads/formidable/67/Letter-of-Inspection-Application-NEMSA.pdf |
PV System | https://nemsa.gov.ng/wp-content/uploads/formidable/67/PV-System-SLD-Technical-Specification.pdf |
Charge Controller or Grid-tie Inverter | https://nemsa.gov.ng/wp-content/uploads/formidable/67/PV-System-SLD-Technical-Specification-2.pdf |
Combiner Boxes | https://nemsa.gov.ng/wp-content/uploads/formidable/67/COMBINER-BOX-4.pdf |
Battery System | https://nemsa.gov.ng/wp-content/uploads/formidable/67/BATTERY-SYSTEM-CONFIGURATION.docx-3.pdf |
Earthing & Surge Protection System | https://nemsa.gov.ng/wp-content/uploads/formidable/67/Earthing-System-Surge-Protection-1.pdf |
User ID | Joseph Ojo |