Admin Request for Inspection REA Solar Mini Grid
Application for | REA Solar Mini-Grid Project |
---|---|
REA Code | REA-CAP-MG |
REA LOT Number | REA/15/NWZC/462/22/0039 |
Blank | Kano |
Register as | Corporate |
NEMSA Certificate Number | CC/EIF/PR/02529 |
First Name | Abubakar |
Last Name | Yanga |
Other Name | A. |
Position | Project Manager |
Phone | 07033011933 |
adamuyanga@gmail.com | |
Address |
No. 5 Mandara Close, Aso Drive, Abuja. |
State | Federal Capital Territory |
Company Name | Abidine Limited |
Company Email | abidinelimited@yahoo.com |
Company Phone | 08076000226 |
Tax Registration Number | 10464479-0001 |
Address |
No. 5 Mandara Close, Aso Drive, Abuja. |
State | Federal Capital Territory |
Name of the Village/Community | Malumfashi |
State | Katsina |
Local Government Area | Malumfashi |
Number of Inhabitants | 1 |
GPS Coordinates | 11.79288 |
Site Address/Detail Description |
Malumfashi Local Government Area, Katsina State |
Activities | Health Care Facility |
Total Solar PV Installed (kWp) | 102.4 |
Total Solar PV Energy Produce Per Day (kwh) | 37.30 |
Total Storage Capacity (kwh) | 200 |
Total Load/Energy Requirement (kWh) | 2200 |
Storage Technology/Manufacturer | Life P04 |
Type of Coupling (AC/DC) | DC coupled |
Generator Rated Power (kVA) | 200 |
Year of Construction | 2022 |
Fuel Type | Diesel |
Generator Model/Manufacturer | Felicity Co. |
Operation | Manual |
Other Generation Technology | Diesel Engine |
Other Rated Power (kVA) | 200 |
Other Model/Manufacturer | IVPM 10048 |
Date of Installation of Mini-Grid | October 18, 2022 |
Date of Application | March 22, 2023 |
Manufacturer | NEVIS Co. |
Model | NE-MONO-400W |
Technology | Full-cell mono-crystalline |
STC power (Wp) | 400 |
Number of Cells | 72 |
MPPT Current | 10.72A |
MPPT Voltage | 37.30 |
Module catalogue # | 16 |
Number Series | Parallel | 4 |
Total Power (Wp) | 6400 |
Fuse (A) | 63 |
Surge Protection Device | 40 KI 1000 VPC |
Converter Catalogue | Low Frequency Hybrid MPPT inbuild |
Cable cross-section | 10mm |
Manufacturer | Felicity |
Model | IVPM 10048 |
Technology | Low Frequency Hybrid MPPT inbuild |
Rated Power | 6,600W |
Rated Voltage | 195V |
Rated Current | 120A |
Manufacturer | Felicity |
Model | LPBF48200 |
Technology | High Energy Density Life P04 |
Cell Voltage (V) | 3.6V |
Battery Voltage | 57.6 |
C10 Capacity | 10KW |
Charge Voltage | 57.6V |
Module Catalogue # | LPBF48200 |
Number Series | Parallel | 6 |
Total C10 capacity [kWh] | 10KWh |
Fuse rating [A] | 75X6=450A |
Date of cell production | October 18, 2022 |
Date of installation | October 18, 2022 |
Cable cross-section [mm²] | 35mm |
General comments | 400A BUSBAR CONNECTED |
PV Generator | Expected open circuit voltage [V] |
String Number | 127 |
Value | 179.04 |
PV Generator | Measured open circuit voltage [V] |
String Number | 128 |
Value | 169 |
PV Generator | Expected load circuit voltage [V] |
String Number | 129 |
Value | 149.2 |
PV Generator | Measured load circuit voltage [V] |
String Number | 130 |
Value | 145 |
PV Generator | Expected short circuit current [A] |
String Number | 131 |
Value | 11.36 |
PV Generator | Measured short circuit current [A] |
String Number | 132 |
Value | 10.89 |
PV Generator | Measured ambient temperature [°C] |
String Number | 133 |
Value | 32 |
PV Generator | Measured module temperature [°C] |
String Number | 134 |
Value | 36 |
PV Generator | Measured solar insulation [W/m²] |
String Number | 135 |
Value | 1000 |
PV Generator | Expected power output [kW] |
String Number | 137 |
Value | 6,400 |
PV Generator | Measured power output [kW] |
String Number | 138 |
Value | 4,800 |
PV Generator | Measured earth resistance of support structure [Ohm] |
String Number | 139 |
Value | 0.1 |
PV Generator | Result of verification of measured values (OK, low, …) |
String Number | 141 |
Value | OK |
Inverter/Charge Controller | General visual inspection observations |
String Number | 141 |
Reference | OK |
Inverter/Charge Controller | Surge Protective Devices functional (indicator at device)? |
String Number | 142 |
Reference | YES |
Inverter/Charge Controller | Overcurrent protection operational (correct fuse rating)? |
String Number | 143 |
Reference | YES |
Inverter/Charge Controller | String cables fixed and cables without damages |
String Number | 144 |
Reference | YES |
Inverter/Charge Controller | Connectors properly connected under no mechanical strain |
String Number | 145 |
Reference | YES |
Battery Storage | General visual inspection observations |
String Number | 228 |
Reference | Specification adhered to |
Battery Storage | Wiring properly done without visual deficits |
String Number | 229 |
Reference | YES |
Battery Storage | Tightening torque of all screws to connectors to the batteries and in between the cells of the batteries is according to the equipment manufacturer’s recommendations |
String Number | 230 |
Reference | YES |
Battery Storage | Battery inverter or charge controller parameters are properly set (correct system configuration, date and time, control of the load shedding relays, reading of external temperature sensor verified, …) |
String Number | 231 |
Reference | YES |
Battery Storage | Safety measures for the respective types of batteries applied |
String Number | 233 |
Reference | YES |
Battery Storage | Deep discharge protection, over-charge protection and temperature monitoring installed and functional |
String Number | 234 |
Reference | YES |
General Safety/Security | General visual inspection observations |
String Number | 317 |
Reference | OK |
General Safety/Security | Inverter protection settings programmed to local requirements? |
String Number | 318 |
Reference | YES |
General Safety/Security | When an RCD is installed to the AC circuit feeding an inverter, the RCD type shall be verified to ensure it has been selected according to the requirements of IEC 60364 |
String Number | 319 |
Reference | YES |
General Safety/Security | Means of isolating the inverter been provided on the AC side? |
String Number | 320 |
Reference | YES |
General Safety/Security | Isolating and switching devices been connected such that PC installation is wired to the “load” side and the public supply to the “source” side? |
String Number | 321 |
Reference | YES |
General Safety/Security | All Inverters/Charge controller operating correctly? |
String Number | 322 |
Reference | YES |
General Safety/Security | Inverter/charge controller protection settings and installer details displayed on site? |
String Number | 323 |
Reference | YES |
Official Letter of Request | https://nemsa.gov.ng/wp-content/uploads/formidable/67/REQUEST-FOR-THE-INSPECTION.pdf |
PV System | https://nemsa.gov.ng/wp-content/uploads/formidable/67/PV-Generator.pdf |
Charge Controller or Grid-tie Inverter | https://nemsa.gov.ng/wp-content/uploads/formidable/67/System-Controller.pdf |
Combiner Boxes | https://nemsa.gov.ng/wp-content/uploads/formidable/67/Combiner-Boxes.pdf |
Battery System | https://nemsa.gov.ng/wp-content/uploads/formidable/67/Battery-Storage-1.pdf |
Earthing & Surge Protection System | https://nemsa.gov.ng/wp-content/uploads/formidable/67/Earthing-and-Surge.pdf |
User ID | Bello Salihu |