Admin Request for Inspection REA Solar Mini Grid
Application for | REA Solar Mini-Grid Project |
---|---|
REA Code | REA-NEP-MG |
REA LOT Number | 0290 |
REA-NEP-MG | PBG |
Blank | Akure |
Register as | Corporate |
NEMSA Certificate Number | CC/CEIF/PR/00609 |
First Name | Joseph |
Last Name | Ojo |
Position | CBO |
Phone | +234 8054016128 |
info@a4tintegrated.com | |
Address |
27b Olumoroti Jaiyesimi Street, Gbagada Phase 2 |
State | Lagos |
Company Name | A4&T Power Solutions Limited |
Company Email | info@a4tintegrated.com |
Company Phone | 07057788920 |
Tax Registration Number | 20022603-0001 |
Address |
27b Olumoroti Jaiyesimi Street, Gbagada Phase 2 |
State | Lagos |
Name of the Village/Community | FAGBO |
State | Ondo |
Local Government Area | Ondo East |
Number of Inhabitants | 6500 |
GPS Coordinates | 7.099532, 4.968311 |
Site Address/Detail Description |
Fagbo Community |
Activities | Business Activity, Educational Facility, Residential |
Total Solar PV Installed (kWp) | 89.6 |
Total Solar PV Energy Produce Per Day (kwh) | 262.08 |
Total Storage Capacity (kwh) | 160kWhr |
Total Load/Energy Requirement (kWh) | 209.77 |
Storage Technology/Manufacturer | Lithium |
Type of Coupling (AC/DC) | DC |
Generator Rated Power (kVA) | 100 |
Year of Construction | 2023 |
Fuel Type | Diesel |
Generator Model/Manufacturer | Perkins UK |
Operation | Automatic |
Date of Installation of Mini-Grid | January 14, 2023 |
Date of Application | March 20, 2023 |
Mini-Grid Owner (Full Name) | A4&T Power Solutions Limited |
Phone | 08054016128 |
info@a4tintegrated.com | |
Manufacturer | Jinko |
Model | JKM400M-6RL3-V |
Technology | Monocrystalline |
STC power (Wp) | 400 |
Number of Cells | 144 |
MPPT Current | 88A |
MPPT Voltage | 1100V |
Module catalogue # | 10 |
Number Series | Parallel | 18 |
Total Power (Wp) | 89600 |
Fuse (A) | 250A |
Surge Protection Device | 20KA |
Converter Catalogue | 0 |
Cable cross-section | 10mm2 |
Manufacturer | Juststandout |
Model | JSO12048165 |
Technology | PV INVERTER |
Rated Power | 12000 |
Rated Voltage | 650V |
Rated Current | 27A |
Manufacturer | Felicity |
Model | LPBF 48300 |
Technology | LiFePO4 |
Cell Voltage (V) | 48 |
Battery Voltage | 48 |
C10 Capacity | 57.6 |
Charge Voltage | 51.2 |
Module Catalogue # | LPBF 48300 |
Number Series | Parallel | 2/1 |
Total C10 capacity [kWh] | 15 |
Fuse rating [A] | 250 |
Date of cell production | December 23, 2021 |
Date of installation | March 14, 2023 |
Cable cross-section [mm²] | 50mm2 |
PV Generator | Expected open circuit voltage [V] |
String Number | 1 |
Value | 727.5V |
PV Generator | Measured open circuit voltage [V] |
String Number | 1 |
Value | 582V |
PV Generator | Expected load circuit voltage [V] |
String Number | 1 |
Value | 625.5V |
PV Generator | Measured load circuit voltage [V] |
String Number | 1 |
Value | 562.95 |
PV Generator | Expected short circuit current [A] |
String Number | 1 |
Value | 10.36A |
PV Generator | Measured short circuit current [A] |
String Number | 1 |
Value | 8.16A |
PV Generator | Measured module temperature [°C] |
String Number | 1 |
Value | 25.0 |
PV Generator | Expected power output [kW] |
String Number | 1 |
Value | 6000W |
PV Generator | Measured power output [kW] |
String Number | 1 |
Value | 4593.67 |
Inverter/Charge Controller | General visual inspection observations |
String Number | 1 |
Reference | Ok |
Inverter/Charge Controller | Inverter protection settings programmed to local requirements? |
String Number | 1 |
Reference | Done |
Inverter/Charge Controller | Means of isolating the inverter been provided on the AC side? |
String Number | 1 |
Reference | Available |
Inverter/Charge Controller | All Inverters/Charge controller operating correctly? |
String Number | 1 |
Reference | Ok |
Inverter/Charge Controller | Isolating and switching devices been connected such that PC installation is wired to the “load” side and the public supply to the “source” side? |
String Number | 1 |
Reference | Ok |
Inverter/Charge Controller | Inverter/charge controller protection settings and installer details displayed on site? |
String Number | 1 |
Reference | Available |
Battery Storage | General visual inspection observations |
String Number | 1 |
Reference | ok |
Battery Storage | Wiring properly done without visual deficits |
String Number | 1 |
Reference | Done |
Battery Storage | Tightening torque of all screws to connectors to the batteries and in between the cells of the batteries is according to the equipment manufacturer’s recommendations |
String Number | 1 |
Reference | Done |
Battery Storage | Safety measures for the respective types of batteries applied |
String Number | 1 |
Reference | Done |
Battery Storage | Cell voltage |
String Number | 1 |
Reference | 44V |
Battery Storage | Deep discharge protection, over-charge protection and temperature monitoring installed and functional |
String Number | 1 |
Reference | Available |
Battery Storage | Cell temperature |
String Number | 1 |
Reference | 25 |
Battery Storage | Number of full cycles calculated by the monitoring system (if applicable) |
String Number | 1 |
Reference | 6000 |
General Safety/Security | General visual inspection observations |
String Number | 1 |
Reference | ok |
General Safety/Security | Inverter protection settings programmed to local requirements? |
String Number | 1 |
Reference | Done |
General Safety/Security | Means of isolating the inverter been provided on the AC side? |
String Number | 1 |
Reference | Available |
General Safety/Security | Isolating and switching devices been connected such that PC installation is wired to the “load” side and the public supply to the “source” side? |
String Number | 1 |
Reference | Available |
General Safety/Security | All Inverters/Charge controller operating correctly? |
String Number | 1 |
Reference | Ok |
General Safety/Security | Inverter/charge controller protection settings and installer details displayed on site? |
String Number | 1 |
Reference | Ok |
Official Letter of Request | https://nemsa.gov.ng/wp-content/uploads/formidable/67/Letter-for-Inspection-Request-NEMSA-1.pdf |
PV System | https://nemsa.gov.ng/wp-content/uploads/formidable/67/PV-System-SLD-Technical-Specification-1.pdf |
Charge Controller or Grid-tie Inverter | https://nemsa.gov.ng/wp-content/uploads/formidable/67/PV-Inverter-and-Battery-System.pdf |
Combiner Boxes | https://nemsa.gov.ng/wp-content/uploads/formidable/67/COMBINER-BOX-1.pdf |
Battery System | https://nemsa.gov.ng/wp-content/uploads/formidable/67/BATTERY-SYSTEM-CONFIGURATION.docx-1.pdf |
Earthing & Surge Protection System | https://nemsa.gov.ng/wp-content/uploads/formidable/67/Earthing-System-Surge-Protection.pdf |
User ID | Joseph Ojo |