CHARGEABLE FEES FOR NIGERIAN ELECTRICITY MANAGEMENT SERVICES AGENCY (NEMSA) SERVICES
    TECHNICAL INSPECTORATE SERVICES              
TABLE ONE (1) CHARGEABLE FEES FOR TRANSFORMERS ACROSS GENERATION, TRANSMISSION & DISTRIBUTION
S/NO TRANSFORMERS CAPACITIES PRIMARY VOLTAGE LEVELS
 0.4KV 11KV 16KV 22KV 33KV 66KV 132KV 330KV
1 1kVA up to and including 25kVA       10,000.00        10,000.00  Nil  Nil       15,000.00  Nil       50,000.00  Nil
2 Exceeding 25kVA up to and including 50kVA       20,000.00        20,000.00  Nil  Nil       25,000.00  Nil  Nil  Nil
3 Exceeding 50kVA up to and including 100kVA       30,000.00        30,000.00  Nil  Nil       35,000.00  Nil  Nil  Nil
4 Exceeding 100kVA up to and including 500kVA       40,000.00        40,000.00  Nil  Nil       50,000.00  Nil       75,000.00      100,000.00
5 Exceeding 500kVA up to and including 1000kVA (1MVA)       70,000.00        70,000.00  Nil  Nil      120,000.00  Nil     150,000.00      150,000.00
6 Exceeding 1000kVA up to and including 2500kVA (2.5MVA)     100,000.00       100,000.00  Nil  Nil      150,000.00  Nil     170,000.00      200,000.00
7 Exceeding 2500kVA up to and including 5000kVA (5MVA)     150,000.00       150,000.00  Nil  Nil      175,000.00  Nil     200,000.00      250,000.00
8 Exceeding 5000kVA up to and including 15000kVA (15MVA)     200,000.00       200,000.00   200,000.00  200,000.00      250,000.00   250,000.00     270,000.00      300,000.00
9 For each 2000kVA in Excess of 15MVA or thereof        10,000.00        10,000.00     10,000.00    10,000.00       10,000.00     10,000.00       10,000.00        10,000.00
10 Rural Electrification fixed charge in addition to charges for Transformers, HT, Lines and LT lines.       50,000.00        50,000.00  Nil  Nil       50,000.00  Nil  Nil  Nil
                   
  TABLE TWO (2)  CHARGABLE FEES FOR TRANSMISSION & DISTRIBUTION LINES, SUBSTATION EQUIPMENT OTHERTHAN TRANSFORMER
  LINES AND EQUIPMENT  0.4KV 11KV 16KV 22KV 33KV 66KV 132KV 330KV
1 For each kilometers or fractional parts of power lines         5,000.00          6,000.00       6,000.00      6,000.00         7,000.00      7,000.00         8,000.00         9,000.00
  IN DOOR EQUIPMENT                
2 Control Room         3,000.00  Nil  Nil  Nil         5,000.00  Nil       10,000.00        10,000.00
3 Control Panel/Each         2,500.00          3,000.00       5,000.00      5,000.00         5,000.00      5,000.00         5,000.00         5,000.00
4 Gas Insulated Substation (GIS)  Nil  Nil  Nil  Nil  Nil  Nil  Nil  Nil
5 CT, VT  Nil  Nil  Nil  Nil       10,500.00     10,500.00       10,500.00        10,500.00
  OUT DOOR EQUIPMENT                
1 RMU  Nil          5,000.00  Nil  Nil         5,000.00  Nil  Nil  Nil
2 CT, VT  Nil  Nil  Nil  Nil         3,500.00      3,500.00         4,000.00         4,000.00
3 Auto-Reclosers  Nil          5,000.00  Nil  Nil         5,000.00  Nil  Nil  Nil
4 Breakers  Nil  Nil  Nil  Nil         5,000.00      5,000.00  Nil  Nil
5 Feeder Pillars         3,000.00          3,000.00  Nil  Nil         3,000.00  Nil  Nil  Nil
6 Control Panels & Switch Gears         2,500.00          3,000.00       5,000.00      5,000.00         5,000.00      5,000.00         5,000.00         5,000.00
7 Isolator Switches  Nil          3,000.00  Nil  Nil         3,000.00      3,000.00         4,000.00         4,000.00
  TABLE THREE (3) CHARGEABLE FEE FOR  MANUFACTURING OF ELECTRICAL MATERIALS AND EQUIPMENT
1 Insulators       30,000.00        37,000.00  –  –      112,500.00  –     150,000.00      300,000.00
  Electrical Materials other than Insulators                
1 Cables and Conductors     100,000.00       150,000.00  –  –      200,000.00  –     300,000.00      450,000.00
2 Special HT Electric Concrete Poles, eg 12m +  –       325,000.00  –  –      325,000.00  –  –  –
3 HT Electric Concrete Poles eg. 10.32m, 10.36m, 10.38 +  –       250,000.00  –  –      250,000.00  –  –  –
4 LT Electric Concrete Poles, eg. 8.52m, 8.54m, 8.56m +     150,000.00  –  –  –  –  –  –  –
5 Manufacturing of Cross Arms  –        50,000.00  –  –      100,000.00  –  –  –
6 Step Down Transformers  –       300,000.00  –  –      500,000.00  –  1,000,000.00   1,500,000.00
7 Step Up Transformers      150,000.00       350,000.00   500,000.00  500,000.00      500,000.00  –  –  –
8 Instrument Transformer  –       150,000.00  –  –      300,000.00  –     500,000.00      500,000.00
9 Control Panels and Switch gear     150,000.00       150,000.00   150,000.00  150,000.00      150,000.00   150,000.00     150,000.00      150,000.00
10 Special Power Equipment and Engineering Services       50,000.00       100,000.00  –  –      150,000.00  –     250,000.00      300,000.00
TABLE FOUR  (4) CHARGEABLE FEE FOR  ELECTRICITY GENERATORS      
S/NO GENERATOR CAPACITIES VOLTAGE LEVELS      
230V  0.4KV 11KV 16KV 22KV      
1 5kVA up to and including 25kVA       10,000.00        10,000.00  Nil  Nil  Nil      
2 Exceeding 25kVA up to and including 50kVA  Nil        20,000.00  Nil  Nil  Nil      
3 Exceeding 50kVA up to and including 100kVA  Nil        30,000.00  Nil  Nil  Nil      
4 Exceeding 100kVA up to and including 500kVA  Nil        40,000.00  Nil  Nil  Nil      
5 Exceeding 500kVA up to and including 1000kVA (1MVA)  Nil        70,000.00  Nil  Nil  Nil      
6 Exceeding 1000kVA up to and including 2500kVA (2.5MVA)  Nil       100,000.00   150,000.00  150,000.00      150,000.00      
7 Exceeding 2500kVA up to and including 5000kVA (5MVA)  Nil       150,000.00   200,000.00  200,000.00      200,000.00      
8 Exceeding 5000kVA up to and including 15000kVA (15MVA)  Nil       200,000.00   250,000.00  250,000.00      250,000.00      
9 For each complete 2,000KVA or thereof in excess of 15000kVA  Nil        10,000.00     10,000.00    10,000.00       10,000.00      
                   
                   
                   
TABLE FIVE  (5) CHARGEABLE FEE FOR  RESIDENTIAL BUILDING AND PREMISES            
S/N Inspection of Electrical Installation in Residential Buildings/Premises; Inspection/ Certification of New Building/
Premises Fee (₦)
Inspection/ Certification of Old Building/
Premises Fee (₦)
           
           
           
1 Bungalow (Studio flat, 1 – 2 Bedroom)       20,000.00        10,000.00            
2 Bungalow (3 – 4 Bedroom)       25,000.00        15,000.00            
3 Bungalow (5 bedroom and Above)       30,000.00        15,000.00            
4 Duplex (3 – 4 Bedroom)       40,000.00        20,000.00            
5 Duplex (5 – 6 Bedroom)       50,000.00        20,000.00            
6 1 – 2 Bedroom Block of flats       10,000.00        10,000.00            
7 3- 4 Bedroom Block of flats       20,000.00        20,000.00            
8 Residential-Commercial       30,000.00        20,000.00            
9 Commercial/Plazas       40,000.00        25,000.00            
10 Small Scale Industrial       50,000.00        30,000.00            
11 Special Installations                
12 ·  High rise building complexes/plazas/shopping malls ( 4 floors & above)   1,800,000.00    1,500,000.00            
13 ·  Building complexes/plazas/shopping malls (2 – 4 floors)   1,200,000.00    1,000,000.00            
TABLE SIX  (6) CHARGEABLE FEE FOR  MARKETS:            
1 Markets with Lock up shops less than 20 5,000.00/Lock up shop 2,500.00/Lock up shop            
2 Markets with Lock up shops exceeding 20 and less than 50 4,000.00/Lock up Shop 2,000.00/Lock up shop            
3 Markets with Lock up shops exceeding 50 and less than 100 3,000.00/Lock up shop 1,500.00/Lock up shop            
4 Markets with lock up shops exceeding 100 and less than 500 2,500.00/Lock up shop 1.250.00/Lock up shop            
TABLE SEVEN (7) CHARGEABLE FEES FOR ELECTRIC MOTORS AND OTHER POWER EQUIPMENT            
S/NO ELECTRIC MOTORS & OTHER EQUIPMENT CAPACITIES VOLTAGE LEVELS            
230V  0.4KV            
1 Heat Ventilation & Air Conditining  1,500.00/Each  2,000.00/Each            
2 Chillers  1,500.00/Each  2,000.00/Each            
3 Cold Rooms  1,500.00/Each  2,500.00/Each            
4 Heat Pumps  1,500.00/Each  2,000.00/Each            
5 Boilers  2,500.00/Each  3,000.00/Each            
6 Furnace  2,500.00/Each  3,000.00/Each            
7 Industrial Fans  1,000.00/Each  1,500.00/Each            
8 Conveyors  2,000.00/Each  3,000.00/Each            
9 Elevators/Lift  2,000.00/Each  3,000.00/Each            
10 Base Services Stations  2,000.00/Each  10,000.00/Each            
11 Datacentres  Nil  10,000.00/Each            
12 Radio Communication Stations  Nil  10,000.00/Each            
13 Telecommunication Mast/VSAT  Nil  20,000.00/Each            
14 Airport Radars  Nil  10,000.00/Each            
15 Tamac Lightening  500.00/Each  500.00/Each            
16 Street Lightings  500.00/Each  500.00/Each            
TABLE EIGHT (8) CHARGEABLE FEES FOR INSTALLATION OF BUILDINGS, HAZARDOUS PLACES ETC.            
  Inspection of Electrical installation in Factories. e.g. Steel, Food, Leather Companies, etc FIXED CHARGE TO BE ADDED TO CAPACITIES  (₦)  YEARLY/ANNUAL FEES             
1 Steel Factories (large/medium/small)     250,000.00       100,000.00            
2 Food/beverages factories (large/medium/small)     200,000.00       100,000.00            
3 Chemical factories (large/medium/small)     250,000.00       100,000.00            
4 Agro-processing factories (large/medium/small)     150,000.00       100,000.00            
5 Auto-mobile factories (large/medium/small)     300,000.00       100,000.00            
6 Building materials factories (large/medium/small)     250,000.00       100,000.00            
7 Milling factories e.g. paper, stationaries, etc     150,000.00       100,000.00            
  Others     150,000.00       100,000.00            
  Hazardous Locations;            
8 Filling Stations 10,000.00 per pump 5,000.00 per pump            
9 Fuel/Oil Depots 100,000.00 per tank 50,000.00 per tank            
10 Refineries   1,000,000.00 500,000.00            
11 IOC On-Land facilities   1,000,000.00 500,000.00            
12 IOCs Off-shore facilities   1,000,000.00 500,000.00            
  Public places other than market            
13 Inspection of Electrical installation in Public places, e.g. Banks, Town Halls, conference halls, event centers, worship centers, etc.       80,000.00        40,000.00            
14 Electrical installation of Cinematograph, Theatre, etc. In addition to capacity charge.       40,000.00        20,000.00            
15 Special Installations, e.g. Caravan, Swimming Pools, Farms, Amusement Parks etc.       50,000.00        25,000.00            
TABLE NINE (9) CHARGEABLE FEES FOR RENEWABLE ENERGY FOR ELECTRCITY GENERATION (SOLAR, WIND, BIOMASS OR HYBRID)            
S/N Fixed charge for inspection of renewable energy for electricity generation (solar, wind, biomass or hybrid) Inspection/ certification fee (₦) Re-inspection fee (₦)            
1 Less than 5kW and below 15,000.00 50% of Inspection Fee            
2 Exceeding 5kW up to and including 10kW 30,000.00 50% of Inspection Fee            
3 Exceeding 10kW up to and including 50kW 52,500.00 50% of Inspection Fee            
4 Exceeding 50kW up to and including 75kW 150,000.00 50% of Inspection Fee            
5 Exceeding 75kW up to and including 100kW 225,000.00 50% of Inspection Fee            
6 Exceeding 100kW up to and including 500kW 375,000.00 50% of Inspection Fee            
7 For each or fractional part 100kW in excess of 500Kw 15,000.00 50% of Inspection Fee            
8 Solar Streetlight   10,000.00/Pole 50% of Inspection Fee